I belive I read here a short time ago that someone had used a link belt on his Jet 1442. How wide should the belt be and can it be installed without undoing the various pieces of the Reeves drive to slide the shaft out as you would to install the original belt. Also, how tight do you make it between the 2 pulleys. Thanks in advance.
Stemo, I took a chance with some internet info and installed a link belt on my Delta 46-715 yesterday. Seems to run quieter.
My 1/2" wide stretched Delta belt was supposed to be 28 1/2" in outside diameter (got that info from Delta parts). The links worked out pretty darn close to that.
I was able to put the speed lever to the max rpm and roll the belt over onto the Reeves pulley on the motor. (After trial and error, I also figured it looks like the tabs should face the pulley to form the V. Duh!)
I have a link belt on my HF 12x33 with Reeves drive. After realizing I had too many links on it and removing the extras, it works fine ... and has for several months.
I don't understand the part about removing the drive to replace the belt. I just slipped mine over the edge and let it plop in. (hint, use a screwdriver if you must to pry it over the edge as you turn the pulley BY HAND - safety first > unplug it from the wall).
"Old Griz" wrote: The Jet 1442 uses a reeves drive system... DO NOT use a link belt on this type of system...(clip) ^^^^^^^^^^^^^ Why not? I have done it, and I believe it works better than a standard solid Vee belt. The advantages are: 1.) The length can be changed in increments of 1/2", allowing you to fine tune the speed range. 2.) If the drive stalls, and damages the belt, only a couple of links need to be replaced, instead of the whole belt. 3.) Smoother running. 4.) IMHO, link belts actually last longer (I have no data to back this up.)
I've been using one on my Jet 1442 for nearly a year. I believe the lathe runs smoother and quieter, and the belt is showing no apparent wear after about 175 hours of use. I'm anticipating in excess of 600 hours on the belt before replacement. I may be way off on that one direction or the other, however.
Short of measuring the width of the belt, suffice it to say that it's very close to the width of the belt I cut off the drive. The primary reason I went to the link belt is that I anticipated some grief in replacing a belt when the time came. With the link belt, you simply assemble it over the shafts, set the speed control to its highest setting, and maneuver the belt onto the pullies. Took a bit of trial and error to get the right length, but it fits fine now.
Seems to be as tight as the old belt was when new.
Probably don't need anymore testamonials than you already have but I used one on my Delta Reeves drive and never had any problem at all. I don't understand the advice about not using one. The speed changes are very smooth and the belt runs with less vibration. And you don't have to take anything apart. Just cut off the old belt and put the link belt on.
InspirePoint website is not affiliated with any of the manufacturers or service providers discussed here.
All logos and trade names are the property of their respective owners.