Hello all,
For the last few weeks I have been doing "time and motion" studies to see just how long it takes me to do a project. All the business sewing books I've been reading say it's very important to do these studies. Well now I know how long it takes me to do certain things but I have no way of knowing if I'm too slow or on target. The time studies are supposed to help me price my work. I thought I'd better find out if my times are on par with others. So, in the interest of study, how long does it take you too ...
Hem up a pair of basic pants without a cuff? How about with a cuff? And jeans? What about those horrid things called "mock" cuffs? I found out it took me longer to do a mock cuff then the real thing.
How long to make a basic straight skirt from the time you lay out the fabric and thread the machine until finished with the hem? Just a basic straight skirt: waistband, button & buttonhole closure, 4 darts front and 4 in back, center back zipper, machine hem, no lining. How much extra time do you allow for a lining? No matter how hard I try, it takes me 2 1/2 hours from start to finish for an unlined skirt.
How about a man's dress style shirt? I have some Chambray fabric in my stash and a shirt pattern for myself. It has long sleeves with a cuff, one button/button hole, collar on a collar band, breast patch pocket, back shoulder yoke, and I'll probably put in about 5, maybe 6 front buttons starting at the neckband. All the buttonholes will be machine done, of course. This pattern gives the option of a shirt tail hem or a straight hem. It will be a new time study for me.
Elastic waist pull-on skirts in knit fabrics that are ankle long? I like making these for spring / summer because they do up so quickly and look nice with a pullover top. I use my hip measurement plus 4 inches. The fabric is just stitched down each side, open on both sides from the knee down. I machine stitch the side slits, do a 2 inch elastic pocket at the top, and a 2 inch blind hem. They take about 90 minutes from the time I lay out the fabric until the hem is finished.
Thanks in advance for your replies!
Liz w