Making about two dozen little paddle keepsakes for my niece's pledge class, each one with burned lettering on the front and a couple coats of stain. Problem is I've somehow sunk close to three hours per piece between sanding, burning the letters, and cleaning up the edges. At this pace I'll be lucky to finish before her deadline. Is it just me, or does everyone slow way down when the pieces are meant to be given away? When I'm building something for my own shop I bang it out no problem, but knowing someone else will hold these in their hands has me fussing over every little tearout and uneven stain blotch. Half of them will probaly end up in a drawer by next semester anyway, and I know that, but it doesn't seem to help.
So my actual question is how do you all handle batch work without obsessing? Do you set a timer per piece, rough them all out first then finish them in stages, or just accept that small stuff takes as long as big stuff? Curious what workflow keeps you moving when you've got twenty more of the exact same thing sitting on the bench.