I have finished NYCO #2--a pair of socks made from the wool left over from 3 other pairs. I had *exactly* enough of the orange/blue violet yarn for the project, and have only little bits of the blue and white and red-violet/yellow-green left. The yarns weren't all exactly the same weight, but they were close enough to all knit on #3 bamboo needles. It's the last item on the page here:
formatting link
#1, the Aran-style cardigan vest, is coming along. Someone saidsomething last week about "at least you're not knitting a sweater oncircular needles." Well, I'm knitting a sweater on circular needles--atleast it doesn't have arms, LOL! It takes about 45 minutes to do a row(while watching TV anyway). I knit from the top down, and I am just about tomy natural waist, so the end is in sight, but I still have to do points inthe front and trim all the edges, and that will be an engineering problem aswell as considerable more knitting. Georgia
formatting link